EV Charging Points in IP6

Ipswich IP6, Ipswich, Suffolk

19
Total Chargers
🔋
0
Rapid (50kW+)
7
Ultra-Rapid
🆓
3
Free Chargers

Charger Speed Breakdown

Standard (7-22kW) 12
Ultra-Rapid (100kW+) 7

Charging Points in Ipswich IP6

Slow
Standard
Rapid
Ultra

Charging Networks in IP6

Average Charging Costs

Speed kW Range Avg Cost Count
Standard 7-22kW 49p/kWh 12
Ultra-Rapid 100kW+ 75p/kWh 7

Browse Chargers

Showing 5 of 5 locations

InstaVolt Hub, Ipswich IP6

Forecourt

Ultra-rapid24/7
InstaVolt·137kW·7 connectors

Ipswich Trade Park

Retail Park

Standard
BP Pulse·7kW·6 connectors

Tesco Extra Ipswich

Supermarket

StandardFree
Pod Point·7kW·3 connectors

Multi-Storey Car Park Ipswich

Car Park

Standard
GeniePoint·14kW·2 connectors

BP Pulse, Ipswich IP6

Car Park

Standard24/7
BP Pulse·22kW·1 connectors

Charger counts last updated June 2026. Live map data via Open Charge Map.

Nearby Postcode Areas

All chargers in Ipswich → Suffolk charging overview →

EV Charging Guides

Frequently Asked Questions

How many EV charging points are there in IP6?
There are 19 EV charging points in the IP6 postcode district (Ipswich IP6), including 0 rapid chargers and 7 ultra-rapid chargers.
Are there free EV chargers in IP6?
Yes, there are 3 free charging points in IP6, typically at Tesco and Lidl supermarkets with Pod Point 7kW chargers.
What is the cost of rapid charging in IP6?
Rapid charging (50kW+) in IP6 costs an average of 75p/kWh. Ultra-rapid charging (100kW+) averages 75p/kWh. Standard 7-22kW chargers average 49p/kWh.
Which EV charging networks operate in IP6?
The main charging networks in IP6 are InstaVolt, BP Pulse, Pod Point, GeniePoint. InstaVolt has the most chargers in the area with 7 charge points.
Where are the nearest rapid chargers in IP6?
IP6 has 7 rapid and ultra-rapid chargers. These are typically found at forecourts, dedicated charging hubs, and some retail parks in the area.

Get an EV Charger Installation Quote

Thinking about getting a charger installed? Leave your details and we'll be in touch about next steps. No obligation.

Where do you need the charger installed?